Sub-contracted through Kingston CAD Solutions to structurally verify a new pipe bridge.
We calculated permanent and imposed loads using the relevant EC3 factors. Consideration to local geographical parameters including wind. The pipe bridge was particularly vulnerable to side wind loads. The structure was verified. A truss system was chosen to maximise and minimise cost.
The client received a structure that was 'fit-for-purpose' and cost effective.
Comprehensive design and analysis of a pipe bridge structure using
Explore our in-depth analysis and design process for a recent pipe bridge project, ensuring structural integrity and optimal performance. Calculation of permanent and imposed loads.
Innovative design and structural verification of an aluminium deck
Explore our recent project where we engineered an aluminium tour deck to Eurocode 9 standards, employing SOLIDWORKS FEA simulations and meticulous hand calculations for structural integrity.
We’re always happy to help, start the conversation and contact us below.